Document an inspection

Inspections you've conducted are documented in the Inspection Tasks screen. Each inspection has one of the following statuses:

  • Open — ready to document
  • In Progress — documentation has begun but isn't finished
  • Evaluation — documentation is complete and waiting for the Chief Inspector's review
  • Complete — documentation is done and has been reviewed by the Chief Inspector
note

Only inspections listed on an approved E&I Plan are eligible for documentation. Inspections must be documented within the same month they're scheduled and can't be carried over to the following period.


Document an inspection

Inspection Tasks sidebar option

  1. Go to Inspection Tasks in the main menu. By default the current month's inspections are shown. Use the year and month selectors to view a different period.

Inspection task listing

  1. Click an inspection with Open status to open the inspection form

  2. Select the QA Inspector who performed the inspection and the date

Select inspector

  1. Select the employees who were inspected and their supervisor. If employees aren't listed, verify they've been added in People configuration and assigned to the correct work center. The supervisor defaults to the Shop supervisor set in Shop configuration.

Select personnel

  1. Enter any equipment used in the inspection (optional). Use the Equipment toggle to identify aircraft or other equipment.

Equipment

Other equipment

  1. Click Add Findings to document any findings from the inspection. Enter the following for each finding:
    • Finding Category (required)
    • Code (required)
    • Reference (required)
    • Remarks (required)

Empty finding list

Add finding

  1. When you've completed the form, either:
    • Click Save Draft to save your progress and return later. The inspection status changes to In Progress
    • Click Send for Chief Inspector Evaluation to submit for review. The inspection status changes to Evaluation

Outcome panel

Inspection task complete

  1. The Chief Inspector reviews the submission and either updates the results or clicks Complete to finalize

Mark as complete